Three first giant ship-to-shore cranes have arrived at Nador West Med port to equip the eastern container terminal, operated by West Med Container Terminal, a joint venture between the MSC group and Marsa Maroc.
The cranes arrived aboard the Chinese heavy-lift vessel Zhen Hua 35, owned by ZPMC.
This arrival marks the beginning of a broad equipment program for the terminal, which will eventually have 15 quay cranes and 45 electric rubber-tyred gantry cranes.
The terminal's capacity, once completed, will reach about 3.4 million TEU per year, making it one of the largest container terminals in the western Mediterranean.
The terminal features a quay of 1,520 meters in length and 18 meters in depth, with storage areas of about 70 hectares.
The first phase is expected to enter service in the fourth quarter of 2026.
The project also includes an energy port, a cargo port, and industrial and logistics zones, aiming to create a new economic hub in the eastern region.
Nador West Med port receives first giant cranes
source: assahifa.com
Share
How do you feel about this?
Related news
More in Nador City
Man arrested in Nador over suspected harassment of a girl
Police officers from the first security district in Nador arrested a man suspected of harassing a girl after receiving a complaint…

Veterinary clinic in Nador organizes free rabies vaccination campaign
On the occasion of World Rabies Day, the VET HOUSE veterinary clinic in Nador is organizing a free vaccination campaign for dogs and cats…

Popular Movement endorses Malika Houleish as head of regional list in Nador
The Popular Movement party has officially endorsed Malika Houleish, sister of former parliamentarian and former president of Nador…

Kourkou resort in Nador suffers from waste accumulation despite its heritage value
The Kourkou resort in the province of Nador is experiencing a paradoxical situation, combining natural and historical beauty with obvious…
Comments (0)