The Nador West Med port project has entered a new phase with the arrival of the first batches of containers at its quays, a sign of progress in preparations for actual operation.
A container ship was seen in the harbour basins manoeuvring with the help of tugboats, as the first containers appeared on site.
This development follows progress in infrastructure and port and logistics equipment.
The arrival does not mean the start of full commercial operation, but marks a stage within the tests and logistical preparations.
The port is expected to strengthen Morocco's port infrastructure and the Oriental region's position in trade and maritime transport networks.
Related news
More in Oriental Region
New Democrats call for massive turnout to vote for the fingerprint symbol
دعا عمر العباس، وكيل لائحة حزب الديمقراطيين الجدد بدائرة طنجة أصيلة، إلى جانب مرشحين آخرين للحزب في جهة طنجة تطوان الحسيمة، الناخبين إلى…

Over a million pupils in the northern region
The new school year in the Tangier-Tétouan-Al Hoceima region saw about 1.039 million pupils enrol in various institutions, nearly 34 % of…

First container ship docks at Nador West Med port
The port of Nador West Med welcomed its first container ship at the new terminal on Monday, 21 September 2026, signalling the shift to…
Comments (0)